翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Rome–Formia–Naples railway line : ウィキペディア英語版
Rome–Formia–Naples railway

The Rome–Formia–Naples railway—also called the Rome–Naples Direttissima in Italian ("most direct")–is part of the traditional main north-south trunk line of the Italian railway network. It was opened in 1927 as a fast link as an alternative to the existing Rome–Naples via Cassino line, significantly reducing journey times. High-speed trains on the route use the parallel Rome–Naples high-speed railway, which was partially opened in December 2005, and fully in December 2009.
==History==
Problems with the Rome–Naples line via Cassino led to proposals for the construction of a new line nearer the coast as early as 1871. When the Papal States planned the Cassino line, it was not designed just as a direct connection with Naples, but also was intended to connect with smaller localities on the way. Partly as a result, it had a tortuous route which, especially in the valley of the Sacco River, was subject to frequent disruption by floods and landslides. The old line was built to the avoid the coastal route through the Pontine Marshes, which was still swampy and malarial. As a result, its route is hilly and in parts mountainous, creating problems for the under-powered steam locomotives of the period.
The construction of a coastal line was authorised by legislation on 29 July 1879 on condition that it was coordinated with the Terracina–Priverno and the Gaeta–Formia–Sparanise lines. The commitment was confirmed by legislation on 5 July 1882 and during the reorganisation of the Italian railways in 1885. The project was always controversial: it is supported by railway engineers such as Alfredo Cottrau〔
〕 but opposed by politicians such as Francesco Saverio Nitti.
The final design of the line was drafted in 1902 and approved in 1905 when responsibility for the project was assumed by Ferrovie dello Stato (the State Railways). Construction began in 1907 but was not finished until 1927 because it was necessary to dig several long tunnels, including the Monte Orso and the Vivola tunnels, both of which are about 7.5 km long.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Rome–Formia–Naples railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.